We have resolved the issue of the alarm and it's NBN compliance... HSI have worked it out... We have upgraded to a cabinet in the garage to protect the NBN equipment from dust and dirt.
As much as I was excited to see the portaloo arrive on our site, it is still just as exciting to see it gone... The end is getting near. I have booked removalists. I have two tentative dates... Hopefully we can go ahead with the first preference but do have a back up plan.
I am getting quotes for turf. I highlighted a copy of our house on the block with measurements and sent it off to a couple of places. Hope to hear from them soon.
And they started the driveway today... Not a good photo, the sun was not in a good spot. I will try to get there earlier and get a better one tomorrow!
Tuesday, 23 April 2013
Wednesday, 17 April 2013
Frustration
Had a busy few days... Trying to organize quotes for the security doors. I am hoping the fence will be down in early May so we can have some done. It will take 3 weeks or them to be made and I would like them in as soon as possible.
I have arranged for outback landscaping to give us a quote for landscaping...also in early May.
Also arranged for the connection to the NBN... All set for when we should be moved in. But this has also caused frustration. Since I was talking with Telstra about our needs. They alerted me to the fact the alarm we are having installed as part of the inclusions in our essential package is probably not NBN compatible. Upon further phone calls, this is the case. HSI is giving us a quote to upgrade it, but this is not acceptable to me. Upon tender presentation EB knew we were in a NBN estate, our electrical appoinment were aware we were in an NBN estate. We upgraded data points and alarm features: extra sensors, remote keyfobs, but also a phone point to the unit so that we could have back to base monitoring. This is the problem. It is not NBN ready for back to base monitoring. upon emailing EB they referred me back to the electrical consultant for an upgrade. I am not going to pay for this upgrade. EB and HSI were aware of our needs and did not advise upgrading at the point of needing to. I have escalated this to management as I do not think we should have to pay for the lack of communication and advise. We were not given spec sheets for our included alarm, so we could question the specifics. An alarm is included in our contract. We upgraded thinking that it would cater for our needs. At the time of the appointment we were shown sensors, strobe lights, internal alarm siren and keypads. We should have been advised here it needed upgrading for our requirements. At present the "included" alarm plus our upgrades does not meet our requirements. And to think we could have moved in to discover this? EB will give me a decision by Friday.
On a happier note, I could see through the windows wire shelving in our wardrobes.. The linen press doors were open but I couldn't see the shelves. I just wasn't tall enough. In our front bedroom windows I was suprised to see my reflection... The mirrors must be in.. Can't wait to see if our ensuite mirror goes right to the edge of the wall.
And our pavers were delivered! A busy week and it's only hump day!
Friday, 12 April 2013
The things we do
I desperately tried to leave work in daylight hours tonight so I can get a decent photo of the front of our house with the garage door on. But when I got there the fence was secure and with the garage door up!! What the...
I was desperate to see if we have any work completed inside today, so I walked the perimeter of the fence. Our bedroom windows are probably neck level... I'm short lol, so to get a better look I stood on the bases of the security fence and heaved myself up so I could see inside...the lengths we go to, to see progress lol
Anyway I could see the handles are on our doors! I saw the bedroom door handle and the linen press handle. No pics as I didn't have a free hand lol
I was desperate to see if we have any work completed inside today, so I walked the perimeter of the fence. Our bedroom windows are probably neck level... I'm short lol, so to get a better look I stood on the bases of the security fence and heaved myself up so I could see inside...the lengths we go to, to see progress lol
Anyway I could see the handles are on our doors! I saw the bedroom door handle and the linen press handle. No pics as I didn't have a free hand lol
Thursday, 11 April 2013
I don't like daylight savings over
I struggled to get to the block tonight in daylight hours... And just my luck the garage door I have waited on since Monday was delivered today and installed....
I think the neighbours must think I am weird because I parked as close to the fence forward facing with my headlights on high beam to get this photo... Can't wait to see it in daylight hours, hopefully tomorrow.
I think the neighbours must think I am weird because I parked as close to the fence forward facing with my headlights on high beam to get this photo... Can't wait to see it in daylight hours, hopefully tomorrow.
Wednesday, 10 April 2013
Another sneak peak..
Front pillar lights
Taps in the ensuite
Shower head in ensuite
Not to forget the toilet lol
Bath is in too, but it needs a massive clean up before I post that picture. I can't wait for the next site clean up... That might mean we are close to being in too.
Tuesday, 9 April 2013
Electrical sneak peak
There have been so much action on site this week... Here are some sneak peaks...
Entry
Master bedroom...
Air conditioning vents in too...
Saturday, 6 April 2013