Saturday, 2 March 2013

What a surprise!

It's the second day of autumn and the cold wet weather has already arrived. After picking up master L, I detoured past the block. Tradies were at the site and let me in... They were plastering the joins in the gyprock from what I can gather. I snuck in and took some photos...
Master bedroom

Kitchen... Fridge space to left, pantry behind Master L

 
Under the alfresco.... Rumpus to the left, meals area behind

 The front, only just noticed the down pipes in.

I will have to inspect the exterior next time and see why the downpipes all look like and placement.

No comments:

Post a Comment